رافعات جسرية
Truss Gantry Crane is a kind of gantry crane that adopts a truss structure as the main girder, the rigid or flexible legs on both sides, and the truss main girder on the top form a gantry frame, which can be moved along the ground track to carry out lifting operations. The truss structure has about 40%-60% air permeability, the wind resistance coefficient is significantly lower than the traditional box girder gantry crane, especially suitable for ports, coastal areas, and other windy places.
The truss structure is usually connected by standardized rods and nodes, which is convenient for factory prefabrication and on-site assembly, easy for inspection and maintenance, and is suitable for engineering occasions requiring frequent disassembling and transferring, such as hydroelectric power station construction, bridge construction, and so on. It is widely used in harbor terminals, bridge construction, power station construction, heavy equipment manufacturing, and other fields.
Truss gantry cranes can be customized according to customer needs, with a lifting capacity of 1~20 tons and a span of 10-60 meters. According to different application scenarios, they can be divided into two major types: single girder and double girder truss gantry cranes.
الموانئ: لتحميل وتفريغ الحاويات وسفن الشحن وما إلى ذلك، لتحسين كفاءة الخدمات اللوجستية.
صناعة بناء السفن: Hull assembly, disassembly, and other operations, because it can handle very heavy parts.
Steel industry: Suitable for the handling and loading, and unloading of large items such as steel plates and steel.
Water conservancy construction: Including the lifting of heavy equipment and materials in the construction and maintenance of dams, channels, etc.
Mines: used for the transportation and loading, and unloading of resources such as ore and coal.
Thanks to the truss structure, Weihua Construction MG features light deadweight and many other strongpoints. The low wind drags makes the gantry crane stand still on the open field of construction yards. The modular design provides ease of assembly, dismantle, maintains and transport. Being different from traditional gantry cranes with box girders, wind blows through the truss girder with low friction, maintaining stability in strong winds.
Weihua AICrane system also makes the crane see things, intelligently identifying humans from cargo before brake in time to improve not only working efficiency, but also safety.
This project is a special project for the prefabricated girder yard of high-speed railroad, which is used for lifting and transferring large segmental girders. The customer purchased a total of 22 truss gantry cranes (Truss Gantry Cranes), which include single main girder and double main girder structures, and are used in the whole process of prefabrication, storage, and loading.
The single girder structure is used for small section girder transfer and auxiliary operations.
The double girder crane adopts a double trolley synchronized control system, which can realize four-point balanced lifting to ensure that the section girders remain level during lifting and avoid structural deformation.
شروط | الوحدات | حدود | ||||
قدرة التحميل | ت | 40 | 60 | 80 | 100 | |
فترة | م | 20~40 | 20~30 | |||
مجموعة الواجب | ايزو | أ5 | ||||
سرعة الرفع | م/دقيقة | 1 | 0.95 | 0.8 | ||
سرعة عبور العربة | 10 | 10.5 | ||||
سرعة حركة الرافعة | 14 | 15 | 13 | |||
إجمالي قوة المحرك | كيلوواط | 22.8~26 | 30 | 31.4 | 46.4 | |
مزود الطاقة | 3ph 380V 50 هرتز أو حسب الطلب |
لا تتردد في ترك رسالة. وسوف نقوم بالرد خلال 24 ساعة.
إرسال الطلب