< img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=1039187934806537&ev=PageView&noscript=1" />
mg truss

Brückenkräne

Truss Gantry Crane

  • Arbeitsnote A5
  • Tragfähigkeit: 40-100 Tonnen
  • Spannweite(m) 20-40 Meter
  • Kranfahren 13-14 m/min
  • Einführung
  • Anmeldung
  • Merkmale des Krans
  • Technische Spezifikation
  • Verwandte Seiten

Produkt-Einführung

Truss Gantry Crane is a kind of gantry crane that adopts a truss structure as the main girder, the rigid or flexible legs on both sides, and the truss main girder on the top form a gantry frame, which can be moved along the ground track to carry out lifting operations. The truss structure has about 40%-60% air permeability, the wind resistance coefficient is significantly lower than the traditional box girder gantry crane, especially suitable for ports, coastal areas, and other windy places.

The truss structure is usually connected by standardized rods and nodes, which is convenient for factory prefabrication and on-site assembly, easy for inspection and maintenance, and is suitable for engineering occasions requiring frequent disassembling and transferring, such as hydroelectric power station construction, bridge construction, and so on. It is widely used in harbor terminals, bridge construction, power station construction, heavy equipment manufacturing, and other fields.

Types of Truss Gantry Crane

Truss gantry cranes can be customized according to customer needs, with a lifting capacity of 1~20 tons and a span of 10-60 meters. According to different application scenarios, they can be divided into two major types: single girder and double girder truss gantry cranes.

Single Girder Truss Gantry Crane

  • A single truss main girder is used, usually arranged above the centerline of the outriggers.
  • The lifting trolley runs along the lower flange of the main girder (suspended) or the upper flange (supported).
  • Simple structural form, lightweight, and easy installation, maintenance, and dismantling.
  • Low foundation load requirement, suitable for sites with average foundation conditions.
  • Suitable for small and medium-sized lifting needs (usually ≤ 50t).
  • Widely used in small and medium-sized workshop material handling, warehouse loading and unloading, light equipment installation and other lifting capacity requirements are not high occasions.
Single girder truss gantry crane
Single Girder Truss Gantry Crane

Double Girder Truss Gantry Crane

  • Two parallel truss main girders are used to form a rigid space frame using transverse linkage beams.
  • The lifting trolley runs on a track between the two main girders.
  • With a large load carrying capacity, the double girders are synergistically loaded, and the lifting capacity can be more than 100 tons.
  • Can withstand asymmetric loads, e.g., shipyard outfitting operations.
  • Allows two trolleys to work together, e.g., four-point lifting of precast bridge girders.
  • Suitable for heavy equipment lifting, such as nuclear power pressure vessels, bridge box girder, and other heavy loads.
  • Widely used in large port container loading and unloading, hydroelectric power station gate installation, heavy machinery manufacturing, bridge and building prefabricated parts lifting and loading, and other heavy loads, large span occasions.
double girder truss gantey crane
Double Girder Truss Gantry Crane

Specifications

BedingungenEinheitenParameter
Ladekapazitätt406080100
Spannweitem20~4020~30
DienstgruppeISOA5
Hebegeschwindigkeitm/min10.950.8
Fahrgeschwindigkeit des Wagens1010.5
Fahrgeschwindigkeit des Krans141513
Gesamtleistung des MotorskW22.8~263031.446.4
Stromversorgung 3ph 380V 50 Hz oder kundenspezifisch

For detailed product information, please refer to the PDF.

Allgemeine Anwendung

Häfen: Zum Be- und Entladen von Containern, Frachtschiffen usw., um die Effizienz der Logistik zu verbessern.
Schiffbauindustrie: Hull assembly, disassembly, and other operations, because it can handle very heavy parts.
Stahlindustrie: Suitable for the handling and loading, and unloading of large items such as steel plates and steel.
Bau von Wasserschutzgebieten: Einschließlich des Hebens von schweren Geräten und Materialien beim Bau und der Instandhaltung von Dämmen, Kanälen usw.
Bergwerke: used for the transportation and loading, and unloading of resources such as ore and coal.

Eigenschaften

Lightweight design: adopting a space truss structure, lightweight, low foundation bearing requirement, suitable for large span operation.

Excellent wind resistance: the open truss structure has low wind resistance, strong wind permeability, and good stability, which is especially suitable for open-air environments, such as harbors and wind power installation operations. The stability is better than box crane in high wind speed areas.

Strong large-span capability: the truss structure can realize a large span (4 to 39 meters) by optimizing the grid layout, which is suitable for bridge construction, power station construction, and other scenarios.

Modular assembly: Segmented truss units, connected by bolts or pins, are easy to transport and quickly assembled on site. Suitable for temporary works or frequent moving operations.

High economy: low material consumption and low manufacturing cost, especially suitable for small and medium tonnage demand; and the lightweight design can reduce the investment in supporting equipment (such as rails and motors).

Flexibility to adapt to complex environments: the structure can be customized, such as triangular, diamond truss; adapt to narrow space or special terrain, such as mountainous areas, offshore platforms, and other special working conditions. Easy to maintain, can locally replace damaged units to reduce costs.

Applicable scenarios: port loading and unloading, wind power equipment installation, bridge erection, temporary construction sites, and other occasions that require lightweight, large span, or wind resistance.

Cases Show

This project is designed for the prefabricated girder yard of a high-speed railroad, which is used for lifting and transferring large segmental girders. The customer purchased a total of 22 truss gantry cranes, which include single main girder and double main girder structures, and are used in the whole process of prefabrication, storage, and loading.

The single girder structure is used for small section girder transfer and auxiliary operations.

The double girder crane adopts a double trolley synchronized control system, which can realize four-point balanced lifting to ensure that the section girders remain level during lifting and avoid structural deformation.

Truss Gantry Crane Supplier - WEIHUA Group

customer-visit-weihua
Certification

FAQS

What are the differences between truss cranes and box cranes?

Comparison itemsTruss craneBox crane
Comparison itemsTruss craneBox crane
Structural designSpace truss structure (steel pipe/steel grid), lightweightClosed box section (steel plate welding), strong rigidity
GewichtLightHeavier
Carrying capacitySmall and medium tonnage (usually ≤100 tons)Large tonnage (up to 1,000 tons)
Wind resistanceLow wind resistance, suitable for open air, high wind speed environmentHigh wind resistance, requiring additional wind resistance design
Rigidity/stabilityGeneral (depending on truss layout)High (excellent bending and torsion resistance)
Applicable scenariosPorts, wind power, temporary projects, large span light liftingMetallurgy, shipbuilding, workshop, heavy precision lifting
Manufacturing complexityMany nodes, complex welding/bolt connectionsHigh requirements for box welding process
Transportation and installationHigh requirements for the box welding processLarge box beams are difficult to transport and often need to be segmented
Maintenance costHigh (need to check nodes regularly)Low (closed structure, good corrosion resistance)
Initial costLow (less material consumption)High (high steel consumption)

Selection Suggestion

Stringer: suitable for lightweight, large span, frequent movement, or open-air operation, such as wind power, or harbor.

Box: suitable for large tonnage, high rigidity, long-term fixed place, such as metallurgical workshop, nuclear power.

Kontakt aufnehmen

Sie können uns gerne eine Nachricht hinterlassen. Wir werden innerhalb von 24 Stunden antworten.

Bitte spezifizieren Sie Ihren Bedarf unter Berücksichtigung der folgenden Aspekte:

  • Welches Kranprodukt benötigen Sie?
  • Wie hoch ist die maximale Hubkapazität (in Tonnen), die für Ihr Projekt erforderlich ist?
  • Können Sie die benötigte Hubhöhe (in Metern) angeben?
  • Können Sie nähere Angaben zum Arbeitsumfeld machen, z. B. zu den Bodenverhältnissen, den Platzverhältnissen und eventuellen Hindernissen?
  • Wie häufig wird das Projekt voraussichtlich genutzt werden und wie lange wird es dauern?

Verwandte Produkte

Möchten Sie Ihre Kranlösungen mit uns individuell gestalten?

E-Mail

[email protected]

𐀟

Nachricht

Whatsapp

+8615803735886

Antrag einreichen

de_DEDE