Summary: Weihua delivered two double girder quenching overhead cranes, 400 tons and 150 tons, to a heat treatment manufacturer in Vietnam. The 400-ton unit is reported to be the largest-capacity quenching crane in the country. Both cranes work on the same production line.
| غرض | تفاصيل |
| وجهة | Vietnam |
| عميل | Heat treatment manufacturer |
| Equipment | Double girder quenching overhead cranes |
| كمية | 2 sets |
| Crane 1 | 400(200+200)+20t |
| Crane 2 | 150/30+20t |
| طلب | Heavy workpiece quenching and handling |
| Duty class | A7 |
| يتحكم | PLC centralized control; stator voltage speed regulation on main hoist |
| Delivery | 2026 |
Both cranes are installed and in service. Together they handle heavy workpieces through the full quenching sequence, from furnace to quench medium.
A quenching crane moves a hot workpiece from the furnace into the quench medium, usually water, brine or oil. The typical sequence is:
Speed, timing and load stability decide the quality of the result. A slow or swinging entry can cause uneven structure or surface damage. This is why a quenching crane is a special-duty machine and not a standard overhead crane.
These measures keep heat away from core electrical and control components. They target the typical high-temperature faults, such as cable ageing and unstable signals, so the cranes can run long continuous shifts.
Both cranes use a latest-generation PLC centralized control system. The main hoist uses stator voltage speed regulation, so the system can coordinate the acceleration and deceleration curves of the main and auxiliary hooks. This gives:
| 400 Ton Crane | 150 Ton Crane | |
| Marking | 400(200+200)+20t | 150/30+20t |
| الرفع الرئيسي | Two 200 t hoisting units | 150 t main hoist |
| Other hoists | 20 t hoist | 30 t and 20 t units |
| بناء | Box-type double girder with walkways and access stairs | Box-type double girder with walkways and access stairs |
Hoist roles follow the markings on the girders. Final configuration details are confirmed in the project design.
| معامل | Typical Range |
| فترة | 28 متراً |
| ارتفاع الرفع | 25 m |
| واجب العمل | A7 |
“Quenching leaves little room for error. We designed these cranes around heat protection and coordinated hook control, so the customer’s line can run steadily with heavy workpieces.”
— Weihua Group, Overseas Business Division
What is a quenching overhead crane?
It is a special-duty overhead crane that moves hot workpieces from a furnace into a quench medium on a controlled schedule.
Why does a quenching crane need heat protection?
Furnace radiation can age cables and disturb signals. Heat-resistant cables, an insulated electrical room and a cab reduce these risks.
Can one crane lift 400 tons with two 200-ton hoists?
A 400(200+200)t marking means two 200-ton hoisting units form the 400-ton main lift. The exact lifting method follows the crane’s design and rated load table.
What information is needed for a quotation?
Workpiece weight, furnace temperature, quench medium, span, lifting height and duty class.
Send us your requirements and our engineers will propose a configuration.
→ رافعة علوية للتبريد السريع لمصنع الصلب
→ رافعة علوية بعارضة مزدوجة
→ Request a Quote
→ تدعوكم شركة WEIHUA إلى معرض VINAMAC EXPO 2026 في مدينة هو تشي منه – تفضلوا بزيارة الجناح B310
Senior Crane Specialist / Technical Advisor
Online SupportOver 10 years of experience in overhead & jib crane solutions. Dedicated to helping global clients find the most efficient and cost-effective lifting equipment.
إرسال الطلب