< img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=1039187934806537&ev=PageView&noscript=1" />
Search
EN
Free Quote

Weihua’s 29 cranes used in Jafula desalination project

Project Overview

In eastern Saudi Arabia, a major project crucial to national strategy and livelihood security is under construction: the Jafura Desalination and Water Supply Pipeline Project. Recently, 29 sets of Weihua's crane equipments were successfully shipped to Saudi Arabia and officially put into use, providing strong support for the lifting, transportation, and maintenance of seawater desalination equipment.

Project Challenges

  1. The coastal environment is characterized by high temperatures, high humidity, and severe salt spray corrosion.
  2. Frequent seasonal sandstorms place extremely high demands on equipment reliability.
  3. The project was tight on time and required compliance with both European design standards and American craftsmanship standards.

Weihua Solutions

Weihua acted as the crane supplier in this internationally renowned project. The company provided 29 sets of crane equipment. These included double-girder overhead cranes, single-girder bridge cranes, gantry cranes, and electric hoists. The equipment served key areas such as the water intake pump room, reverse osmosis equipment, and booster pump stations. It provided strong support for lifting, transportation, and maintenance of seawater desalination equipment.

  • Upgraded corrosion protection for key components, ensuring motors and electrical systems are resistant to high temperatures and dust;
  • Established a comparison system with European and American standards, ensuring full compliance with design and process standards;
  • Implemented batch shipments based on plant progress to ensure timely completion of construction milestones.

Feedback

Thanks to the Weihua team's efficient service of "2-hour arrival + 24-hour resolution", Weihua equipment has achieved zero failure rate operation, serving key areas such as water intake pump rooms, reverse osmosis devices, and booster pump stations. The service response is "faster than demand", winning high recognition from customers.

Project Outcomes

The Weihua team successfully delivered the Jafura project in Saudi Arabia. Through solid strength and reliable service, they established a new benchmark for Chinese brands. This achievement not only lays a foundation for future expansion into port desalination plants and island water supply projects, but also contributes to the sustainable development of global water resources with "Chinese wisdom."

Weihua Group continues to provide reliable, intelligent, and green lifting solutions for major infrastructure and energy projects, contributing to sustainable development. Contact our professional team for customized solutions!

Related Products

Want to Customize Your Crane Solutions with Us?

Email

[email protected]

𐀟

Message

Whatsapp

+8615803735886

Submit Request

tr_TRTR